Skip to main content
VEE Logo
  • Home
  • About
  • Services
  • Sectors
  • Projects
  • Key Clients
  • Partners
  • Careers
  • Contact
en
|de
VEE Logo
  • Home
  • About
  • Services
  • Sectors
  • Projects
  • Key Clients
  • Partners
  • Careers
  • Contact

Volks Evo Energie

German engineering excellence for energy, infrastructure, and industrial projects.

Company Profile (PDF)

About

  • Who We Are
  • Governance
  • HSE

Services

  • Services
  • Sectors
  • Projects

Resources

  • Careers
  • Contact

© 2026 Volks Evo Energie GmbH. All rights reserved.

Privacy PolicyImprint
Eocene Development Project — Wafra Joint Operations

Eocene Development Project — Wafra Joint Operations

Upstream facilities development for Eocene reservoir production at the Wafra field — at bidding stage under tender JO/HC169/PD25.

Project Overview

Development of surface and subsurface facilities to support Eocene reservoir

production at the Wafra field, including wellhead facilities and gathering

systems, flowlines and manifolds, central processing and utility systems,

and integration with existing Wafra field infrastructure.

The tender (JO/HC169/PD25) has been issued and extended by the client and is

currently at bidding stage. Total duration is approximately 52 months:

2 months mobilization, 40 months construction, 12 months defects liability.

Brownfield integration with existing facilities, large-scale upstream

infrastructure, and multi-discipline engineering and execution make this a

strategically important development for Kuwait–Saudi joint production. VEE

is participating at tender stage, providing engineering, sourcing, and

proposed PMC capabilities and engaging with international OEMs and partners

for execution strategy.

Scope of Work

  • Front-End Engineering Review and Detailed Engineering
  • Wellhead and surface facility design
  • Pipeline routing and stress analysis
  • Process system design and integration
  • HSE and environmental compliance design

Deliverables

  • Procurement of oilfield equipment and materials
  • Construction of well pads, flowlines, and processing facilities
  • Mechanical, piping, electrical, and instrumentation works
  • Testing, pre-commissioning, and commissioning
  • Proposed PMC: planning, cost control, QA/QC, HSE, handover
Project Details
Location
Wafra Oil Field
Year
2025
Duration
~52 months (2 mob · 40 construction · 12 DLP)
Client
Wafra Joint Operations (on behalf of Kuwait Gulf Oil Company)
Categories

Sectors

Oil & GasUpstream

Services

Engineering DesignEPCPMC/EPCM
Key Outcomes
Tender Ref.JO/HC169/PD25
StatusBidding Stage
ReservoirEocene
Total Duration~52 months